HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What factors cause the monomer to be unqualified during startup and shutdown processes?

2018-05-07View Original

Thread Content

What factors cause the monomer to be unqualified during startup and shutdown processes?
Reply #22018-05-07
Factors that fail to follow the operating procedures strictly can lead to \"monomers becoming unqualified due to those factors during start-up and shutdown processes.\" It is recommended to thoroughly learn and master the principles of equipment operations, from individual devices to the production processes of entire systems; this will solve all your problems. They are all key points; none of those aspects can be ignored.
Reply #32018-05-07
During startup and shutdown, VCM monomer is generally considered to be of substandard quality; unstable flow rates, pressures, and hot water levels can all be caused by inexperienced operators.
Reply #42018-05-07
If there’s no problem with the equipment, it’s a matter of operation.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.