Parking location for cranes in the electrolyzer plant building

2020-03-25View Original

Thread Content

The crane in the electrolysis plant is parked above the electrolyzers; should it be moved to an open area? Is there any basis for this?
Reply #22020-03-26
**There are no explicit regulations specifying the operating procedures for cranes used in workshops; only the Safety Regulations for Crane Machinery (GB6067-85) exist. Each factory formulates its own operating procedures for the cranes used within its workshops. If stopping in a certain position poses a risk to safety, there will be relevant regulations. As for the issue you mentioned, if there is no safety problem, it’s merely possible that the area above the electrolyzer has a relatively high level of humidity, which can lead to corrosion; this might affect the service life of the crane. GB6067-85
Reply #32020-05-12
Logically, it should be placed in the designated empty area below, with clear markings

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.