Requirements regarding the distance between the liquid chlorine cylinder filling control room and the cylinder filling site

2023-05-30View Original

Thread Content

Dear sea friends: Recently, the emergency management department organized experts to conduct inspections for safety hazards in \"liquid chlorine (chlorine) production enterprises.\" Rectification measures were required for the control rooms (observation rooms) located near the liquid chlorine cylinder filling sites; control rooms should not be installed in areas where liquid chlorine is filled. Regarding this issue, I would like to ask how my colleagues handle it From the perspective of operational convenience, if this control room (observation room) is located far away from the filling site, it will cause many difficulties in operations!
Reply #22023-05-30
According to the provisions of the \"Technical Specifications for Safety in Liquefied Gas Filling\" (GB 50156-2012), the filling control room for chlorine gas cylinders should be located near the filling site, but at a certain distance from it. Specifically, a partition wall or fire separation distance should be installed between the filling control room for liquid chlorine cylinders and the filling site in order to meet the relevant safety requirements. The exact distance depends on the actual circumstances, and it should be determined by taking those factors into account. Relevant safety regulations and technical standards can serve as a reference, and the specific conditions of the enterprise can also be considered in making a decision. During the operation process, to facilitate operators’ observation and monitoring of the filling process, appropriate monitoring systems and alarm devices, as well as necessary communication equipment, can be installed in the filling control room to ensure the safety and smooth progress of the filling process. .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.