HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Waste acid pyrolysis absorption tower

2021-07-07View Original

Thread Content

The acid-resistant bricks inside have cracks, and the bricks containing acid cannot dry out in a short time – how can these cracks be sealed up quickly?
Reply #22021-07-09
It is recommended to use glue filling, in the gap between the asbestos board and the enclosure
Reply #32021-07-11
For acid-catalyzed cracking absorption towers where the interior doesn’t dry out, is there any fast-drying, acid-resistant adhesive?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.