HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The first core equipment of Ningxia Baofeng’s second 500,000 tons per year coal-to-olefins project – the fresh catalyst tank – was successfully lifted into place

2026-03-12View Original

Thread Content

On March 11, the first core equipment of Ningxia Baofeng’s second 500,000 tons per year coal-to-olefins project – the fresh catalyst tank – was successfully lifted into place. This marks the official transition of the project from the civil construction phase to the equipment installation phase, providing strong support for the timely and high-quality completion of the project. The 500,000 tons per year coal-to-olefins project in Ningxia Baofeng is a key construction project of Baofeng Energy Group. Located in the coal-based new materials industry zone of the Ningdong Energy and Chemical Industry Base, the project utilizes DMTO technology and olefin separation technology. To date, 80% of the civil engineering work for the project has been completed, 20% of the electrical and instrumentation grounding work has been finished, and the installation of the remaining 17 large-scale equipment is progressing in an orderly manner. On October 31, 2024, the Development and Reform Commission of the autonomous region issued a approval decision regarding the second 500,000 tons per year coal-to-olefins project of Ningxia Baofeng Energy Group Co., Ltd. The decision specified that the project would be constructed in Area A of the Linhe Comprehensive Project Zone within the Ningdong Energy and Chemical Industry Base. The project will construct a 1.5 million tons per year coal gasification to methanol plant (4 in operation and 2 as backups), a 500,000 tons per year methanol to olefins plant, a 250,000 tons per year ethylene-vinyl acetate copolymer (EVA) plant, and a 300,000 tons per year polypropylene plant, along with the necessary utility systems and auxiliary facilities. Heat requirements will be met through centralized supply from the park’s power island, so no heating boilers will be installed at the project site. Upon completion and reaching full production capacity, the project will be able to produce 250,000 tons of EVA per year, as well as some low-density polyethylene; it will also be capable of producing 300,000 tons of polypropylene, along with by-products such as propane, C4, C5, and sulfur. The total investment in the project amounts to 1,205,772 million yuan, of which 1,135,528 million yuan is allocated to construction costs, 99,920 million yuan to working capital for the initial phase, and 60,252 million yuan to interest during the construction period. The funds for this project will come from the company itself, amounting to 361,731 million yuan, which represents 30% of the total investment.
Reply #22026-03-14
【Ten Years of Rapid Development in Chemical Equipment】3034–2026: The world’s first fixed-bed copper-based catalyst process; East China University of Science and Technology, in collaboration with chlor-alkali chemical manufacturers, overcomes the challenge of recycling hydrogen chloride as a by-product. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715177 (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #32026-03-16
【Haichuan Equipment Guessing Game】Wasps’ nests growing on pipes? ? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715340 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #42026-03-16
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705828 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #52026-03-16
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711616 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #62026-03-17
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2037 to 2026: China’s first independently designed and built large-scale integrated fracturing engineering vessel, the “Ocean Oil 696”, was delivered in Zhoushan, Zhejiang. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715229 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72026-03-18
【Ten Years of Rapid Development in Chemical Equipment】3038=2026: Shandong Energy’s independently developed aldehyde-based fragrance project fills a technical gap in China, reducing reliance on imports! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715785 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #82026-03-18
【Ten Years of Rapid Development in Chemical Equipment】3038=2026: Shandong Energy’s independently developed aldehyde-based fragrance project fills a technical gap in China, reducing reliance on imports! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715785 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #92026-03-18
A true classic! ! ! The elbows subjected to prolonged liquid flow really take your breath away! ! ! ! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714477 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #102026-03-21
【Ten Years of Rapid Development in Chemical Equipment】China’s Giant Glass Fiber Production Line for Electronic Use, the Largest in the World, Goes Online 3041-2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715973 (Source: Haichuan Chemical Forum (HCBBS))
Reply #112026-03-22
【Special Topic on Safety Facility Design】Discussion Summary Post: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714902 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.