Project information: Petrochemical projects and desulfurization and denitrification projects planned for construction in February 2017!

2017-02-16View Original

Thread Content

1. Summary Table of Petrochemical Projects Planned for Construction in February 2017 (Partial)
Project Name, Progress Stage, Total Investment (10,000 yuan)
Shandong Qingyuan Petrochemical Co., Ltd.’s 250,000-ton/year Dearomatic Solvent Oil Production Facility – Under construction, 40,000
Shandong Dongfang Hualong Industry & Trade Group Co., Ltd.’s Joint Facility for Upgrading Oil Product Quality – Engineering design phase, 20,000
Fujian Petrochemical Group Co., Ltd.’s Project to Build a Plant with an Annual Output of 50,000 tons of Superabsorbent Resins – Approval and project initiation in progress, 50,000
Zhejiang Yilong New Materials Co., Ltd.’s Project to Produce 240,000 tons of Acrylate Waterborne Resins per year (Phase 2: 160,000 tons) – Planning stage, 100,000
Zhejiang Yilong New Materials Co., Ltd.’s Project to Produce 240,000 tons of Acrylate Waterborne Resins per year (Phase 1: 80,000 tons) – Engineering design phase, 168,000
Xinhua United Metallurgy Holding Group Co., Ltd.’s Project to Build a Coking Facility as part of a plant with an annual output of 8 million tons of high-quality steel – Engineering design phase, 250,000
Qian’an Oil Extraction Plant’s 2016 Project for Renovating the Transportation and Water Injection Systems – Environmental impact assessment, 1,000
Dalian Goodyear Tire Co., Ltd.’s Project to Produce 3 million radial passenger car tires per year (part of Phase 5 expansion) – Under construction, 996,264
Zhongxiang Jinying Energy Technology Co., Ltd.’s Project to Produce 200,000 tons of ligroin per year (Phase 2) – Under construction, 110,000
Luoyang Hongxing New Energy Chemical Co., Ltd.’s 600,000-ton/year Aromatic Hydrocarbons Project – Preparation for construction, 200,000
China National Petroleum Corporation’s Urumqi Petrochemical Company’s Project to Build a 1 million-ton/year Continuous Reforming Unit – Environmental impact assessment, 102,447
Gongyi Guandong Metal Technology Co., Ltd.’s Project to Produce 20,000 tons of coated aluminum coils per year (Phase 2) – Planning stage, 1,000
Wanhua Chemical Group Co., Ltd.’s Project to Expand the Propylene Oxide Facility and Methyl Isobutyl Ketone and Diisobutylene Production Lines – Environmental impact assessment, 3,000
Shandong Hongxin Chemical Co., Ltd.’s Project to Relocate and Renovate the Old Factory Complex – Environmental impact assessment, 6,100
Shaanxi Yanchang China Coal Yulin Energy & Chemical Co., Ltd.’s 300,000-ton/year Low-Density Polyethylene and Ethylene Vinyl Acetate Copolymer Production Facility (LDPE/EVA) – Engineering design phase, 200,000
Fujian Shenyuan New Materials Co., Ltd.’s Project to Produce Hydrogen from Methanol – Under construction, 30,000
Shandong Hongxin Chemical Co., Ltd.’s Project to Produce 50,000 tons of Resin Polyols per year – Environmental impact assessment, 20,000
Shandong Nickel New Materials Technology Co., Ltd.’s Clean Energy Project – 4×1,000,000 tons/year project for producing clean coal through rapid pyrolysis of coal in a hierarchical manner – Environmental impact assessment, 400,000
Guangxi Fusui Shengli Adhesive Co., Ltd.’s Project to Produce 25,000 tons of urea-formaldehyde resin, 5,000 tons of phenol-formaldehyde resin, 5,000 tons of white latex, 10,000 tons of putty adhesive, 3,500 tons of impregnated paper, and 1,500 tons of hot melt adhesive film per year – Environmental impact assessment, 92,071.1
Shanxi Maosheng Coal Chemical Group Co., Ltd.’s Project to Replace 1.2 million tons/year of coking capacity – Environmental impact assessment, 888,653.77
Sinoma Ruifeng New Energy (Ningxia) Co., Ltd.’s 300,000-ton/year Coal Tar Hydrogenation and 100,000-ton/year Comprehensive Utilization of Waste Methanol (Phase 1) Project – Engineering design phase, 64,000
Sinoma Ruifeng New Energy (Ningxia) Co., Ltd.’s 300,000-ton/year Coal Tar Hydrogenation (Phase 2) Project – Engineering design phase, 20,000
Aisen (China) Flocculant Co., Ltd.’s Project to Produce 50,000 tons of Dimethylaminoethyl Acrylate, 96,000 tons of Quaternary Ammonium Salts, and 11,000 tons of Methanol, along with related facility expansions – Engineering design phase, 27,492.4
Anhui Haid Petroleum Chemical Co., Ltd.’s Phase 3 Project (300,000 tons/year α-Olefins and Biodiesel Production Facility) – Environmental impact assessment, 15,000
Shandong Huabin Chemical Technology Co., Ltd.’s Project to Upgrade the Quality of Products from a 300,000-ton/year Polymerization Facility and Build a 250,000-ton/year Aromatic Hydrocarbons Refining Facility – Environmental impact assessment, 15,000

Details of Projects Planned for Construction:
1) Shandong Dongfang Hualong Industry & Trade Group Co., Ltd.’s Joint Facility for Upgrading Oil Product Quality: Total budgeted investment: 200,000,000 yuan. Progress stage: Engineering design phase. Location: Guangrao County, Dongying City, Shandong Province. Project details: This facility includes a 1.6 million tons/year wax oil hydrogenation unit, a 1.2 million tons/year continuous reforming unit, and a 2 million tons/year diesel hydrogenation and upgrading unit. It is also equipped with a 100 tons/h acid water stripping unit and a 60,000 m³/h natural gas hydrogen production unit. The total investment for the project is 200 million yuan. 2) The total budget investment for Zhejiang Yilong New Materials Co., Ltd.’s project to produce 240,000 tons of acrylate-based water-based resins per year (with an initial capacity of 80,000 tons) is 1,680 million yuan. Current stage: engineering design. Location of the project: Jiaxing City, Zhejiang Province. Project details: This project involves the production of 240,000 tons of acrylate-based water-based resins per year, with an initial capacity of 80,000 tons; the project covers a land area of 225.6 mu. It will be implemented in phases, with the first phase focusing on the construction of a facility with a capacity of 80,000 tons. The total investment for the project is 1.68 billion yuan. 3) Total budgeted investment for Luoyang Hongxing New Energy Chemical Co., Ltd.’s 600,000-ton/year aromatic compounds production project: 2,000,000 million yuan. Current stage of development: preparation for construction. Location of the project: Luoyang City, Henan Province. Details of the project: The 600,000-ton/year aromatic compounds production project undertaken by Luoyang Hongxing New Energy Chemical Co., Ltd. covers an area of 900 mu; it includes the construction of a comprehensive building, a central control room, and a laboratory covering 3,000 square meters, as well as production and auxiliary facilities such as sewage treatment systems ; Hydrocracking, continuous reforming, sulfur recovery units, as well as tank farms and loading/unloading facilities. The total investment for the project is 2,000 million yuan. 2. Summary (Partial) of Planned Desulfurization and Denitrification Projects Across the Country in February 2017
Project Name, Progress Stage, Total Investment (10,000 yuan)
Desulfurization and denitrification project for the biomass cogeneration project of Changqing Group in Caoxian County – Approval and initiation of the project: 5,000
Desulfurization and denitrification project for the biomass cogeneration project of Guangdong Changqing (Group) Co., Ltd. in Pingqiao District, Xinyang City – Approval and initiation of the project: 5,000
Feasibility study approval for the denitrification project associated with PERLusulu Power 600MW coal power plant of Zimbabwe Energy Company: 17,000
Environmental impact assessment for the desulfurization and denitrification project related to the municipal solid waste incineration project in Changchun City: 1,000
Feasibility study approval for the desulfurization project associated with PERLusulu Power 600MW coal power plant of Zimbabwe Energy Company: 31,000
Desulfurization and denitrification project for the 2×280t/h boiler “upgrading large units and replacing small ones” project in Yuncheng, Shanxi Province – Under construction: 4,000
Environmental impact assessment for the desulfurization and denitrification project (BOT) related to the municipal solid waste incineration power generation project in Xingping City: 2,000
Approval for the desulfurization and denitrification project associated with the biomass power generation project of Nandian Energy Comprehensive Utilization Co., Ltd. in Yangshan: 5,000
Signing and implementation of the desulfurization and denitrification project for the agricultural and forestry waste power generation project in Tianlin Liang: 5,000
Approval for the desulfurization and denitrification project related to the biomass power generation project in Danzhou, Hainan: 5,000
Approval and initiation of the desulfurization and denitrification project for the agricultural and forestry waste cogeneration project in Luoshan County: 5,000
**Preparatory work for the EPC construction of the desulfurization project associated with the expansion of the 2×660,000-kilowatt units at Fenyi Power Plant of China Power Investment Group Jiangxi Electric Power Co., Ltd.: 31,000
Preparatory work for the desulfurization and denitrification project related to the municipal solid waste incineration power generation project in Danzhou, Hainan Province: 2,000
Engineering design for the desulfurization and denitrification project associated with the 2×350,000-kilowatt cogeneration project of Huaneng: 28,000
Preparation of a project application report for the desulfurization and denitrification project related to the biomass energy cogeneration project in Jiangxi: 5,000
Approval for the desulfurization project associated with the 2×350MW “upgrading large units and replacing small ones” cogeneration project at Guodian Jilin Thermal Power Plant: 17,000
Approval for the denitrification project associated with the second-phase expansion project of Botou Thermal Power (2×350MW supercritical heating units) of Hebei JianTou: 11,000
Environmental impact assessment for the desulfurization and denitrification project related to the first-phase municipal solid waste incineration power generation project in Zhuyang County (BOO): 1,000
Feasibility study approval for the desulfurization and denitrification project (PPP) related to the first-phase integrated urban and rural sanitation project in Luoyuan (Venous Industrial Park): 1,000
Planning concept for the desulfurization and denitrification project related to the second-phase municipal solid waste incineration power generation project in Zhuyang County (BOO): 1,000

Details of the planned projects:
1) Desulfurization and denitrification project for the biomass power generation project in Danzhou, Hainan
Total budgeted investment: 50,000,000 yuan
Progress stage: Approved
Location of the project: Danzhou City, Hainan Province
Project details: The desulfurization and denitrification project is part of the biomass power generation project in Danzhou, Hainan. The project involves the construction of 2 sets of 15MW condensing steam turbine generators, along with environmental protection facilities such as those for desulfurization, denitrification, and dust removal. The total investment for the project is 50 million yuan. 2) Total budgeted investment for the desulfurization and denitrification project associated with the first phase of the municipal solid waste incineration power generation project in Congyang County (BOO): 10 million yuan. Progress stage: Environmental impact assessment. Location of the project: Congyang County, Anqing City, Anhui Province. Details of the project construction: The desulfurization and denitrification project associated with the first phase of the municipal solid waste incineration power generation project in Congyang County (BOO) is located in Congyang County, Anqing City, Anhui Province. The project uses limestone-gypsum desulfurization and urea denitration. The total investment for the project is 10 million yuan. 3) Total budgeted investment for the desulfurization and denitrification projects associated with the Tianjin Huadian Nangang Thermal Power Project: 20 million yuan. Current stage of development: The feasibility study has been approved. Location of the project: Binhai New Area, Tianjin. Project details: For the desulfurization and denitrification projects linked to the Tianjin Huadian Nangang Thermal Power Project, the desulfurization process involves calcium injection inside the circulating fluidized bed boiler, combined with wet limestone-gypsum desulfurization outside the boiler; the overall desulfurization efficiency is not less than 99.6%. The denitrification process makes use of low-nitrogen combustion technology, along with SNCR and SCR methods, resulting in a denitrification efficiency of not less than 80%. The total investment for the project is 20 million yuan.
Reply #22017-02-17
Good resource. Those who intend to change jobs or follow up on projects are lucky
Reply #32017-02-17
Impressive! Where can one find this information? Good, summarized so well.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.