“What does “departure” mean?

2017-05-15View Original

Thread Content

In a tank storage project, the owner said that \"100 cubic meters per hour is required for discharge,\" and there’s also a discharge pump, as well as a pump that can handle both discharge and loading in one operation. What does \"discharge\" mean in this context? I would appreciate some advice from experts
Reply #22017-05-15
It’s about loading the material; the requirement is to be able to load 100 cubic meters of the medium per hour, and loading and unloading should be able to be carried out using the same pump.
Reply #32017-05-15
It’s the loading pump. Generally, one pump is used for unloading and loading.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.