HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Practice questions on March 7, 2017; replies will earn 2–6 points (**no scoring after it is displayed, thank you for your replies)

2017-03-07View Original

Thread Content

Multiple-choice question: When crude oil contains a high amount of water, the measures that should be taken are ( B ). A. Increase processing capacity and maintain the liquid level at the bottom of the initial distillation tower. B. Reduce or stop the injection of water in the crude oil electrodesalination process. C. Stop power supply to the electrodesalination tank. D. Reduce the amount of demulsifier injected
Reply #22017-03-07
B. Reduce or stop water injection for electrical desalination of crude oil
Reply #32017-03-07
B. Reduce or stop water injection for electrical desalination of crude oil
Reply #42017-03-07
B. Reduce or stop water injection for electrical desalination of crude oil

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.