HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Common problems and key operation points during the start-up and shutdown of VQS

2019-03-12View Original

Thread Content

VQS is now widely used; those who have used it could please share their experiences regarding starting up and shutting down the system, as well as the key points to keep in mind during normal operation. Thank you.
Reply #22019-03-12
You can search for the keyword “VQS”; discussions related to it mention that making good use of search functions can **improve your ability and efficiency in solving problems!**
Reply #32019-03-23
VQS has a relatively high rapid separation efficiency; its drawback is that it is sensitive to the catalyst linear velocity. It is necessary to control this velocity carefully during operation, stepping outside the unstable velocity range in a timely manner to prevent material loss. The routine operation involves regularly calculating the swirl head speed and the top swirl velocity, and keeping them within the specified limits! For the specific range data of the unstable linear speed area, the original poster can look up relevant information

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.