HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Catalytic Coking Reformate Blending Version 20190623

2019-06-23View Original

Thread Content

This post was last edited by wlf1234 on 2019-6-23 06:34. Participants: Prize 1 Wealth; Correct answer: 3 Wealth as a reward. https://bbs.hcbbs.com/static/image/hrline/2.gif https://bbs.hcbbs.com/static/image/hrline/3.gif Multiple-choice question: Among the following options, which one represents the incorrect procedure during the shutdown of an absorption stabilization system? ( ) A. Before shutting down, coordinate with fractionation to stop the supply of rich and lean absorption oil. B. Before shutdown, operate the tanks in each column at low liquid level. C. Before shutdown, increase inspections of the liquid level in the flare condensate tank. D. Redirect the gaseous hydrocarbons from the stabilizer top to the compressor inlet. Answer: D https://bbs.hcbbs.com/static/image/hrline/1.gif https://bbs.hcbbs.com/static/image/hrline/2.gif Note: The answer will be announced automatically after two days.
Reply #22019-06-23
D. Change the venting of gaseous hydrocarbons at the stabilizer top to the compressor inlet

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.