HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Insulation status of pipelines in the coking unit

2022-12-14View Original

Thread Content

For the pipeline running from the outlet of the coking heater to the feed section at the bottom of the coke tower, the temperature of the insulated outer wall of this pipeline ranges between 60 and 65°C. We use 150 mm thick silicate rock wool, with an aluminum coating on the outer surface. The temperature difference between this value and the surrounding environment temperature of 25°C is over 40°C, which is considered unacceptable. Do any of my colleagues have any solutions to this issue? Are there any good insulation materials?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.