What conditions must be met for the manholes of the two devices to be opened?
Reply #22011-07-06
1. After the deslagging is complete, close the raw material plug valve (sliding valve), turn off the feed pre-heating steam and atomization steam, reduce the amount of stripping steam used, open the vent valve at the top of the settler, and install a blind flange on the oil-gas line. 2. Close all steam valves in the two-unit system, open the drain valve, open the regeneration and standby plug valves (sliding valves), and open the manholes of the reactor and regenerator; after the interior has cooled down, conduct an inspection.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.