HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Is there any mandatory specification or requirement regarding the number of pressure monitoring points for the low-pressure low-alarm interlock after the fuel gas flame arrester in a tubular heating furnace?

2024-03-07View Original

Thread Content

Seeking help: Is there any mandatory regulation or requirement regarding the number of pressure sensing points for the low-pressure interlock system (such as two-out-of-three) for the fuel gas pressure and the pilot light pressure after the fuel gas flame arrester in a tubular heating furnace?
Reply #22024-03-07
There are no specific mandatory requirements, but it is recommended to design based on actual operating conditions and safety requirements; multiple pressure sampling points are usually used to ensure reliability. Such as two-out-of-three or three-out-of-four, etc. .
Reply #32024-06-05
The number of pressure tapping points for the low-low interlock of fuel gas pressure and pilot light pressure is three out of two, which is reasonable.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.