Jinling Petrochemical’s centralized solvent regeneration project has been officially put into operation

2026-03-27View Original

Thread Content

Recently, after nearly 10 months of renovation, the purified dry gas from Jinling Petrochemical’s No. 1 desulfurization unit was successfully transferred from the flare system to the pipeline network of the purified dry gas system, marking the official commissioning of the company’s key energy-saving renovation project – the centralized solvent regeneration project. Through technical upgrades, this project integrated the dispersed solvent regeneration systems of three units into a single centralized unit, increasing the regeneration capacity by 1.6 times. Intensive renovation has significantly reduced the number of equipment units and the floor space required, thereby cutting labor costs and equipment maintenance efforts. It is expected to save around 20,000 tons of steam and 20 tons of solvents per year, which will greatly improve the operational efficiency and energy consumption levels of the facility. Faced with challenges such as complex system processes, a large number of pipelines, and numerous interface points, the company adheres to the principles of \"safety first, quality first,\" coordinates the construction efforts, details operation procedures and project start plans in advance, has technical personnel on site throughout the process to oversee things, and resolves technical issues promptly. Organize departments such as production, equipment, safety, and environmental protection to jointly verify the status of pipeline valves, the installation of blind flanges, discharge pathways, and related instruments, and carry out water flushing on each section of the main process pipelines. Coordinated the training for the commencement of new projects, organizing team members to learn the process procedures and equipment operation on-site, thus providing a solid guarantee for smooth project commencement.
Reply #22026-03-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】Key dehydrogenation technology for the toluene-methylcyclohexane organic liquid hydrogen storage system: Approved for use from 2030 to 2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716272 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32026-03-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first subcritical once-reheat power unit was successfully connected to the grid for electricity generation between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716102 (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #42026-03-27
【HaiChuan Safety Discussion】Hidden Dangers Around Us -- Collection of Safety Hazards at Instrumentation and Electrical Interfaces https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716450 (Source: HaiChuan Chemicals Forum (HuaHaiChuanLiu hcbbs))
Reply #52026-03-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first domestically developed third-generation nuclear power steam release isolation valve for the \"Hualong One\" reactor, model 3045-2026, has been officially shipped. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716068 (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #62026-03-29
【Common Issues in Haichuan Pipeline Design】--How to open and maintain valves that are crowded together? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716525 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #72026-03-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】Completion of China’s first independently developed 1500kN intelligent positioning winch system integration, 3055–2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716494 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82026-03-29
Which party is responsible for designing the equipment lifting lugs: the design unit, the manufacturing unit, or the construction unit? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716586 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #92026-03-31
【Ten Years of Rapid Development in Chemical Equipment】3058-2026: Changzhou University makes breakthroughs in ethylene glycol hydrogenation and refining technology; the world’s first upgrade project for converting light hydrocarbons into ethylene glycol is successfully commissioned. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716686 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102026-03-31
【Ten Years of Rapid Development in Chemical Processing Equipment】3057–2026: International Leadership in Organic Tubular Microporous Membrane and Related Equipment Technologies https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716683 (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.