The buried depth of the underground drainage pipes in the new project is insufficient; the requirement is that they be buried at a depth of 1.4 meters or more, but the actual depth is only 1 meter. How can this issue be resolved?
Reply #22017-02-19
I have seen this type of problem in two instances: soil is placed on top to increase the burial depth, and the sides and the upper part are secured with concrete.
Reply #32017-02-20
Strengthen freeze protection in winter. Insulation on the pipeline.
Reply #42017-02-20
The sewage discharge pipe meets the requirement of 1.4M; actually, around 1M is sufficient
Reply #52017-02-26
One can’t rely on luck; if it freezes and cracks, it’s completely unusable.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.