HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Weekly Topic】【Civil Engineering Version 20170516】

2017-05-16View Original

Thread Content

This post was last edited by hesonchang214 on 2017-5-16 at 16:19. Reward for participation: 2 Wealth. Correct reward: 6 wealth. A contract for a certain underground construction project stipulates that 500 m3 of concrete work is to be completed by March, with a contract price of 600 yuan per m3. In March, the actual volume of concrete work completed for this project was 400 m3, at an actual unit price of 700 yuan/m3. By the end of March, the cost performance index (CPI) for this project was ( ).   A. 0.800  B. 0.857  C. 1.167  D. 1.250  Answer: B
Reply #22017-05-16
A contract for the construction of an underground project stipulates that 500 m3 of concrete work is to be completed by March, at a contract price of 600 yuan per m3. In March, the actual volume of concrete work completed for this project was 400 m3, at an actual unit price of 700 yuan/m3. By the end of March, the cost performance index (CPI) for this project was (A).   A. 0.800  B. 0.857  C. 1.167  D. 1.250

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.