HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Weekly Question】【Civil Engineering Version 20170615】

2017-06-15View Original

Thread Content

This post was last edited by hesonchang214 on 2017-6-15 09:31. Reward for participation: 2 wealth points. Correct reward: 6 Wealth. When applying polymer-modified asphalt waterproofing membranes using the hot-melting method, the main procedures include ( ). a. Spreading hot asphalt b. Rolling it out c. Removing air bubbles d. Rolling to ensure adhesion e. Sealing the joints 【Answer】bcde
Reply #22017-06-15
When polymer-modified asphalt waterproofing membranes are installed using the hot-melting method, the main procedures include (BCDE): a. Spreading hot asphalt, b. Rolling it out, c. Removing air bubbles, d. Rolling to ensure adhesion, e. Sealing the joints

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.