【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210122

2021-01-22View Original

Thread Content

Based on the functions of the surge chamber in a hydropower station, what basic requirements should its design meet? We welcome active participation in discussions; the system offers generous rewards for answering questions from VIP members! ! !
Reply #22021-01-22
(1) The pressure regulation chamber should be placed as close as possible to the plant building in order to shorten the length of the pressure pipes. (2) The surge chamber should have a free water surface and sufficient bottom area to ensure adequate reflection of shock waves ; (3) The operation of the pressure regulation chamber must be stable. When the load changes, the fluctuations in the water levels in the intake canal and pressure regulation chamber should decay rapidly to reach a new stable state ; (4) During normal operation, the head loss caused by the water flow passing through the bottom of the pressure regulating chamber should be low. To this end, the bottom of the pressure regulation chamber and the connection point with the pressure pipeline should have a small cross-sectional area. (5) The structure is safe and reliable, the construction is simple and convenient, and the cost is economical and reasonable.
Reply #32021-01-23
(1) The pressure regulation chamber should be placed as close as possible to the plant building in order to shorten the length of the pipelines leading to the pressure source. (2) The surge chamber should have a free water surface and sufficient bottom area to ensure adequate reflection of water hammer waves ; (3) The operation of the pressure regulation chamber must be stable. When the load changes, the fluctuations in the water levels in the intake canal and pressure regulation chamber should decay rapidly to reach a new stable state ; (4) During normal operation, the head loss caused by the water flow passing through the bottom of the pressure regulating chamber should be low. To this end, the bottom of the pressure regulation chamber and the connection point with the pressure pipeline should have a small cross-sectional area. (5) The structure is safe and reliable, the construction is simple and convenient, and the cost is economical and reasonable.
Reply #42021-01-23
(1) The pressure regulation chamber should be placed as close as possible to the plant building in order to shorten the length of the pressure pipes. (2) The surge chamber should have a free water surface and sufficient bottom area to ensure adequate reflection of shock waves. (3) The operation of the pressure regulation chamber must be stable. When the load changes, the fluctuations in the water levels in the intake canal and surge chamber should decay rapidly to reach a new stable state. (4) During normal operation, the head loss caused by the water flow passing through the bottom of the pressure regulating chamber should be low. To this end, the bottom of the pressure regulation chamber and the connection point with the pressure pipeline should have a small cross-sectional area. (5) The structure is safe and reliable, the construction is simple and convenient, and the cost is economical and reasonable.
Reply #52021-01-23
(1) The pressure regulation chamber should be placed as close as possible to the plant building in order to shorten the length of the pressure pipes. (2) The surge chamber should have a free water surface and sufficient bottom area to ensure adequate reflection of shock waves ; (3) The operation of the pressure regulation chamber must be stable. When the load changes, the fluctuations in the water levels in the intake canal and pressure regulation chamber should decay rapidly to reach a new stable state ; (4) During normal operation, the head loss caused by the water flow passing through the bottom of the pressure regulating chamber should be low. To this end, the bottom of the pressure regulation chamber and the connection point with the pressure pipeline should have a small cross-sectional area. (5) The structure is safe and reliable, the construction is simple and convenient, and the cost is economical and reasonable.
Reply #62021-01-23
(1) The pressure regulation chamber should be placed as close as possible to the plant building in order to shorten the length of the pipelines leading to the pressure source. (2) The surge chamber should have a free water surface and sufficient bottom area to ensure adequate reflection of water hammer waves ; (3) The operation of the pressure regulation chamber must be stable. When the load changes, the fluctuations in the water levels in the intake canal and pressure regulation chamber should decay rapidly to reach a new stable state ; (4) During normal operation, the head loss caused by the water flow passing through the bottom of the pressure regulating chamber should be low. To this end, the bottom of the pressure regulation chamber and the connection point with the pressure pipeline should have a small cross-sectional area. (5) The structure is safe and reliable, the construction is simple and convenient, and the cost is economical and reasonable.
Reply #72021-01-24
(1) The pressure regulation chamber should be placed as close as possible to the plant building in order to shorten the length of the pressure source pipelines. (2) The surge chamber should have a free water surface and sufficient bottom area to ensure adequate reflection of shock waves ; (3) The operation of the pressure regulation chamber must be stable. When the load changes, the fluctuations in the water levels in the intake canal and pressure regulation chamber should decay rapidly to reach a new stable state ; (4) During normal operation, the head loss caused by the water flow passing through the bottom of the pressure regulating chamber should be low. To this end, the bottom of the pressure regulation chamber and the connection point with the pressure pipeline should have a small cross-sectional area. (5) The structure is safe and reliable, the construction is simple and convenient, and the cost is economical and reasonable.
Reply #82021-01-25
(1) The pressure regulation chamber should be placed as close as possible to the plant building in order to shorten the length of the pipelines leading to the pressure source. (2) The surge chamber should have a free water surface and sufficient bottom area to ensure adequate reflection of water hammer waves ; (3) The operation of the pressure regulation chamber must be stable. When the load changes, the fluctuations in the water levels in the intake canal and pressure regulation chamber should decay rapidly to reach a new stable state ; (4) During normal operation, the head loss caused by the water flow passing through the bottom of the pressure regulating chamber should be low. To this end, the bottom of the pressure regulation chamber and the connection point with the pressure pipeline should have a small cross-sectional area. (5) The structure is safe and reliable, the construction is simple and convenient, and the cost is economical and reasonable.
Reply #92021-01-27
(1) The pressure regulation chamber should be placed as close as possible to the plant building in order to shorten the length of the pipelines leading to the pressure source. (2) The surge chamber should have a free water surface and sufficient bottom area to ensure adequate reflection of water hammer waves ; (3) The operation of the pressure regulation chamber must be stable. When the load changes, the fluctuations in the water levels in the intake canal and pressure regulation chamber should decay rapidly to reach a new stable state ; (4) During normal operation, the head loss caused by the water flow passing through the bottom of the pressure regulating chamber should be low. To this end, the bottom of the pressure regulation chamber and the connection point with the pressure pipeline should have a small cross-sectional area. (5) The structure is safe and reliable, construction is simple and convenient, and the cost is economical and reasonable

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.