HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Weekly Topic】【Civil Engineering Version 20170616】

2017-06-16View Original

Thread Content

Participation reward: 2 Wealth. Correct reward: 6 Wealth. Ground construction methods – Which of the following statements is correct? ( )   a. Adhere to the construction principle of \"underground first, then aboveground\". b. After construction at the overall level, the curing time must be no less than 7 days. c. The thickness of the lime-soil cushion should not be less than 60 mm. d. The spacing between longitudinal contraction joints should not exceed 10 m, while the spacing between lateral contraction joints should not exceed 12 m. e. When constructing stairs, the height difference between adjacent steps on the same floor level should not be greater than 10 mm. 【Answer】abe

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.