The overall progress of the Zhongsha Gulei ethylene project has reached 90.5%

2025-11-27View Original

Thread Content

It was recently reported that the overall progress of the Sino-Saudi Ghulai Ethylene Project, located in the Ghulai Development Zone, has reached 90.5%. The process equipment has been 89.8% completed, while the utility systems are 92.4% finished. The civil framework structure has been largely completed, and work has now shifted fully to stages such as steel structure installation, pipeline installation, and equipment installation. In the Zhongsha Gulei ethylene project, the packaging and warehouse unit for the polypropylene plant has been mechanically completed, and this unit has fully entered the production preparation phase ; The first power supply to the 35kV substation in the EPC general contracting project for the wastewater treatment system of the Gulei 1.5 million tons/year ethylene and downstream processing complex was successfully completed, providing a solid foundation for the subsequent commissioning and stable operation of the project. On November 20, Fujian Zhongsha Petrochemical Co., Ltd. held the seventh senior-level meeting for the Zhongsha Gulei Ethylene Project. This meeting fully recognized the achievements made by the project since the sixth high-level meeting, accurately analyzed the current status of the project, systematically identified the existing problems and challenges, and made unified arrangements for the key tasks before and after the Spring Festival.
Reply #22025-11-27
【Multiple Images】Hoisting and Installation of the Key Equipment, the Conversion Furnace, in the Hunan Petrochemical Biomass Gasification Flexible Platform Construction Project https://bbs.hcbbs.com/thread-5706685-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #32025-11-27
【Ten Years of Rapid Development in Chemical Equipment】The period from 2025 to 2035 opens up new paths for the green and low-carbon development of the steel industry. China’s first project for 100% conversion of coke oven gas has been implemented in Lingyuan, Liaoning https://bbs.hcbbs.com/thread-5706563-1-1.html (Source: HCBBS Chemical Forum)
Reply #42025-11-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】World’s First High-Pressure Underground Hydrogen Storage Well and Hydrogen Refueling Station Built in Chongqing 2851-2025 https://bbs.hcbbs.com/thread-5706583-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #52025-11-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】The pilot-scale biomass gasification project carried out by Donghua Company in China’s chemical engineering sector began operations in 2025, producing syngas. https://bbs.hcbbs.com/thread-5706633-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62025-11-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】2854-2025: SHENGU’s self-developed 15MPa high-pressure, 30,000 standard cubic meters per day low-flow expansion generator sets contribute to China’s first project for generating power from the residual pressure in high-pressure natural gas transmission pipelines. https://bbs.hcbbs.com/thread-5706687-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-11-29
【HaiChuan Chemical Construction Technology】The ultimate solution to extend the lifespan of instrument pipelines in winter – starting with electric heat tracing https://bbs.hcbbs.com/thread-5706825-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #82025-11-30
【Ten Years of Rapid Development in Chemical Equipment】2847-2025: The first domestically produced million-ton-scale methanol synthesis reactor passed the factory acceptance test. https://bbs.hcbbs.com/thread-5706030-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #92025-11-30
【Ten Years of Rapid Development in Chemical Equipment】2841-2025: Longyu’s low-temperature heat coupling distillation technology for coal chemical processing recognized https://bbs.hcbbs.com/thread-5705831-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102025-11-30
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2028 to 2025, Sinopec Shenzhen Research Institute developed China’s first decoupled, square-meter-scale photoelectric hydrogen production system. https://bbs.hcbbs.com/thread-5705739-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112025-11-30
【Ten Years of Rapid Development in Chemical Equipment】2833-2025 – Amazing! Nanjing Engineering’s new construction technology for spherical storage tanks based on full-position automatic welding has been put into large-scale use at Maoming Petrochemical https://bbs.hcbbs.com/thread-5705632-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.