What should be done when the room foundation encounters an existing cable trench?

2017-07-09View Original

Thread Content

I have a question: For the renovation of a power plant, it is necessary to build a new room that needs to pass over the existing cable trench, which is still in use. How should the foundation of this room be constructed at the location of the cable trench?
Reply #22017-07-13
Without compromising the basic strength, a hole can be left for the cable trench; this option can also be considered if the cables need to be rerouted
Reply #32017-07-21
Place the building’s foundation below the cable trench

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.