Thread Content
Participation reward: 2 Wealth. Correct reward: 6 wealth. Multiple-choice question: When opening bids, if the bid documents exhibit any of the following conditions, they should be treated as invalid bid documents (). A. Not sealed in accordance with the requirements specified in the tender documents. B. The bid letter does not bear the bidder’s official company seal nor is it signed or sealed by the legal representative. C. In the case of a joint bid, no joint bid agreement is attached. D. It clearly fails to meet the technical standard requirements. E. It was submitted after the bid opening. Correct answers: A, B, C, E
When the bid documents are inspected at the bid opening and the following conditions are found, they shall be treated as invalid bid documents (ABCDE). A. Not sealed in accordance with the requirements specified in the tender documents. B. The bid letter does not bear the bidder’s official company seal nor is it signed or sealed by the legal representative. C. In the case of a joint bid, no joint bid agreement is attached. D. Clearly does not meet the technical standard requirements. E. Submitted after the bid opening
When the following conditions are found in the tender documents during the bid opening, they shall be treated as invalid tender documents (ABCE). A. Not sealed in accordance with the requirements specified in the tender documents. B. The bid letter does not bear the bidder’s official company seal nor is it signed or sealed by the legal representative. C. In the case of a joint bid, no joint bid agreement is attached. D. Clearly does not meet the technical standard requirements. E. Submitted after the bid opening
ABC, D, and E all represent significant deviations that constitute a lack of substantive response among the valid bids, and such bids should be eliminated during the preliminary evaluation stage.