HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Topic】【Civil Engineering Version 20170724】

2017-08-07View Original

Thread Content

Participation reward: 2 Wealth. Correct reward: 6 wealth. A certain project was put into use without going through the completion inspection process; the construction owner started operating the storefront on the street level ahead of time. Soon, issues such as local ground subsidence and cracks in the load-bearing walls were detected. The entity that bears legal responsibility for this quality issue is ( ).   A. Project owner B. Construction contractor C. Contractor D. Survey and design firms Correct answer: C

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.