[Civil Engineering Version] Daily Question 20171103

2017-11-03View Original

Thread Content

Among the following options, which one correctly describes the regulations regarding sampling and specimen retention for the concrete strength of structural members?   A. For every 100 batches of concrete with the same mix ratio and a volume not exceeding 200 m3, sampling must be carried out at least once.   B. When less than 100 batches of concrete with the same mix ratio are prepared per working shift, sampling shall be carried out at least once.   C. When a single continuous pouring volume exceeds 500 m3, sampling of concrete with the same mix ratio must be carried out at least once every 200 m3. D. For each floor, sampling of concrete with the same mix ratio must be done at least once. E. At least 2 sets of standard curing specimens should be retained for each sampling; the number of sets of specimens cured under the same conditions should be determined based on actual needs.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.