HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Discussion】Utilities - Civil Engineering - 20200914

2020-09-15View Original

Thread Content

The repeated driving method involves, after the single-driving process is completed and the pile tube is pulled out, placing a second pile tip at the original pile location; then sinking the pile tube a second time to force the uncured concrete at that location into the surrounding soil, thereby increasing the diameter of the pile. Finally, concrete is poured again and the tube is pulled out once more. Is this sentence correct? We welcome active participation in discussions; the system offers generous rewards for answering questions from VIP members! ! !

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.