In current projects, the schedule is often tight, and construction is not carried out strictly in the order specified in the design drawings. For example, the structure usually receives the conditions from upstream only at the end, but civil construction tends to be carried out earliest. How can the sequencing of civil engineering drawings be adjusted to meet the on-site construction requirements? For example, if the contractor needs to purchase materials in bulk which will take some time, how can the work schedules of both parties be coordinated? I’m not familiar with structural design; I’d like some advice!
Reply #22017-11-13
Originally, it was **not allowed** to carry out construction while designing, but in China, this practice is still quite common, especially in the industrial sector. It is generally recommended to carry out construction on-site after certain progress has been achieved in the structural design. If the project timeline is tight, it is possible to coordinate with the designers; the design schedule should be aligned with the on-site construction progress, and the owner’s procurement plan must also fit in with this schedule.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.