HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

\"Mnemonic for Direct Operations\"

2021-11-17View Original

Thread Content

In the HSE system of a certain plant’s thermal power department, contractor risks have always been among the top ten risks associated with thermal power operations, and the direct work involved in inspection and maintenance is particularly vulnerable to issues. The high turnover of personnel in the maintenance units, the varying quality of these employees, and their insufficient understanding of the actual operational processes pose significant risks to the stable operation of the thermal power department. To address this issue, under the guidance of the company’s Safety and Environment Department and drawing on our own practical experience, we developed a complete set of concise guidelines for direct operations.
Reply #22021-11-17
This post was last edited by Zhi Zi Ming on 2021-11-17 at 18:51. The \"Direct Work Instructions\" are easy to remember and understand; they come in the form of small cards for convenient carrying. Once introduced, they were widely spread among contractors, helping to raise awareness of the key risk points in on-site direct work. The back of the \"Direct Operation Mnemonics\" card also prints the safety production prohibitions, environmental protection production prohibitions, and strict prohibition rules, making them easily visible at a glance.
Reply #32021-11-17
Amazing, classic! Talent, poet!
Reply #42022-09-24
To issue an invoice, schedule an appointment first, confirm on-site before signing the invoice; safety instructions are essential, and video surveillance must be in place; Use a safety belt, a life belt – it’s necessary to wear one whenever working at heights of more than two meters. Always fasten the belt when on high places, so that falling won’t cause serious harm ; Use temporary electricity; pay attention to the wiring. Getting wet or coming into contact with metal can lead to electric shock. To avoid getting electrocuted while working, test for electrical leaks every day before starting work ; When working with fire, act quickly but first conduct an analysis to ensure there are no flammable gases; have fire extinguishing measures ready, and prevent sparks from falling from heights ; Access is restricted; tickets must be signed, replacement analysis must be carried out first, rescue facilities must be available, and evacuation via alarm must take priority ; Involves lifting; it is a specialized task. The rigging supervisor oversees the lifting operation and has full control of the site, while the warning area must be cleared ; When starting construction, be careful; ensure that all necessary approvals are in place. Do not disrupt the underground cables – wait until everything is confirmed before beginning excavation ; Install blind flanges, isolate the pipelines, check all inlet and outlet valves carefully; keep the location of the blind flanges in mind – the blind flanges are key to controlling the entire system ; When repairing equipment, be careful: it’s essential to turn off the power and lock it in place. Check for electricity with a test device before starting repairs, and only unlock it after the work is completed ; The work isn’t complete until it’s finished; it’s only complete after both parties give their approval. The maintenance site must be cleaned up, and everything used in the work must be removed so that the area is tidy! An item for equipment repair was added to the original mnemonic by the poster
Reply #52022-09-24
The experience gained through practice is invaluable in every regard; thumbs up!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.