[Civil Engineering Version] Daily Question 20180502

2018-05-02View Original

Thread Content

A certain sub-project consists of 3 construction phases, each divided into 4 construction sections with equal flow rhythms; the flow rhythms for each construction phase are 6, 6, and 4 days respectively. If the organization accelerates the rhythmic flow construction, then the flow interval and the duration of the flow construction will be ( ) days respectively.   A, 2 and 22   B, 2 and 30   C, 4 and 28   D, 4 and 36 Answer: A

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.