During the major maintenance of the facility, a hot work permit was issued, and on-site inspections confirmed that the conditions for carrying out hot work were met; by this time, the welder had already reached the highest point of the facility to begin working. The patrol supervisor noticed oil in the pit beneath the cutting site where the light hydrocarbons were being removed. Although fire trays and fireproof blankets had been used at the site, the supervisor still felt that the safety measures were insufficient, so he immediately used a loudspeaker to order work to be stopped. At the same time, contact the construction unit to come to the site to pump out the oil, and use oil-absorbing felt to remove all the oil from the pit. The construction unit has also raised its awareness and further strengthened fire prevention measures.
Reply #22021-01-05
During major maintenance operations, the site is large and the noise from construction activities is high; providing walkie-talkies for the inspection supervisors is meant to ensure that the construction workers can hear instructions clearly, thus keeping safety always in mind.
Reply #32021-01-15
This issue should be one that the person responsible for handling work orders raises as a point for improvement; however, equipping supervisors with walkie-talkies is an excellent idea that worth adopting*
Reply #42021-02-01
It’s your management that’s effective – work stops as soon as it’s ordered to stop. Here, even when work is halted, it doesn’t stop; during piping work, the diameter of the pipes became too large, resulting in uneven arrangements both horizontally and vertically. The workers wanted to use welding to cut them, and the sparks generated were extremely intense. Since the welding was taking place inside a workshop while the reactors were still in operation, the risk was already very high. Instead of removing the pipes to deal with the issue, the workers wanted to weld on them. After work was halted, a manager arrived and suggested using a plate to block it off. . . It’s really speechless
Reply #52021-02-09
The corporate security environment and leaders’ security awareness are the most crucial elements of security strength.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.