HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Utilities – Civil Engineering Version】20180918

2018-09-18View Original

Thread Content

This post was last edited by hesonchang214 on 2018-9-20 at 17:10. When excavating soil in deep foundation pits, on-site monitoring of temporary support structures is required; however, monitoring does not include (). A: Horizontal displacement of the support structure B: Settlement of adjacent buildings C: Vertical displacement of the retaining structure D: Lateral deformation of the retaining structure Answer: C

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.