【Utilities – Civil Engineering Version】20181014
2018-10-14View Original
Thread Content
In index symbols, the number 5 represents ( ). A: Detail number B: Drawing number C: Standard drawing D: Drawing No. 5. Answer: ARelated Threads in This Forum
← Previous
- 【Daily Question】Utilities - Mechanical & Electrical - 201904
- 【Question of the Week】【Civil Engineering Version 20170815】 -
- 【Utilities – Civil Engineering Version】20181127 - HCBBS Foru
- 【Daily Question】Utilities - HVAC - 20200703 - HCBBS Forum
- 【Daily Discussion】Utilities - HVAC - 20200723 - HCBBS Forum
- 【Daily Question】Hydropower Engineering - 20191223 - HCBBS Fo
- [Utilities – Water Supply and Drainage Section] 20180914 - H
- 【Haichuan Construction Technology】Construction Technology fo
- Anhui Carbonxin’s 30,000 tons per year ethylamine production
- 【Daily Question】Utilities – Civil Engineering – 20190214 - H
Next →
- Safety production claim planning and counterclaim measures -
- 【Daily Question】Utilities - HVAC - 20200624 - HCBBS Forum
- 【Daily Question】Hydropower Engineering - 20191022 - HCBBS Fo
- 【Daily Question】Utilities - HVAC - 20190930 - HCBBS Forum
- 【Daily Question】Utilities - Water Supply and Drainage - 2019
- 【Public Utilities — Engineering Version】2018.09.16 - HCBBS F
- Analysis of Employment Prospects for Civil Engineering Major
- [Utilities – Water Supply and Drainage Section] 20181228 - H
- 【Weekly Topic】【Civil Engineering Version 20170716】 - HCBBS F
- 【Utilities – Mechanical & Electrical Edition】20180929 - HCBB
Translated at 2026-07-23 11:26:39
Original: https://bbs.hcbbs.com/thread-2098931-1-1.html
© 2026 HCBBS Forum. Content translated for international readers.