HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question】Utilities - Water Supply and Drainage - 20190328

2019-03-28View Original

Thread Content

The hydraulic calculation of tree-shaped pipe networks can be divided into the calculation of main lines and branch lines. The so-called trunk line refers to ( ). a. The collection of all pipe sections along the route from the water supply point to the farthest user b. The collection of all pipe sections along the route from the water supply point to the starting point of the branch lines c. The collection of all pipe sections along the route from the water supply point to the water pressure control point d. The collection of all pipe sections along the route from the water supply point to the regulating structures Answer: c
Reply #22019-03-28
b、The collection of all pipe sections along the route from the water supply point to the starting point of the branch line
Reply #32019-03-28
c、The combination of all pipe sections along the route from the water supply point to the water pressure control point

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.