When determining the design elevation of the inlet floor for a shore-based water intake pump house, which of the following statements is incorrect? () A. When the pump house is located alongside the channel, add 0.5m to the design maximum water level ; B. When the pump house is located by a river, add the wave height to the design maximum water level and then 0.5 m; if necessary, measures should be taken to prevent waves from rising too high ; C. When the pump house is located by a lake, reservoir, or sea, the design maximum water level should be the wave height plus 0.5 m, and measures should be taken to prevent waves from rising too high ; D. When the pump house is located beside the reservoir, measures to prevent wave overtopping may not be necessary. Answer: D
Reply #22019-04-14
C. When the pump house is located by a lake, reservoir, or sea, the design maximum water level should be the wave height plus 0.5 m, and measures should be taken to prevent waves from rising too high;

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.