HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question】Utilities - Civil Engineering - 20190418

2019-04-18View Original

Thread Content

Division of water tower foundation and tower body (  ).   A. Bound by the top surface of the expanded part of the brick masonry B. Bound by the floor level of the expanded part of the brick masonry C. Bound by the bottom surface of the expanded part of the brick masonry D. Bound by the average surface of the expanded part of the brick masonry 【Answer】A 【Explanation】For brick chimneys and brick water towers, the volume is calculated by multiplying the perimeter of the average center line of the chimney/water tower wall as shown in the design drawings by its thickness and height. Division of the water tower foundation and tower body: The boundary is the top surface of the expanded brick masonry section; the area above this is the tower body, while the area below is the foundation.
Reply #22019-04-18
A. Defined by the top surface of the expanded part of the brick masonry
Reply #32019-04-18
D. Bound by the average surface of the expanded part of the brick masonry
Reply #42019-04-18
A. Defined by the top surface of the expanded part of the brick masonry
Reply #52019-04-18
A. Defined by the top surface of the expanded part of the brick masonry

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.