HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question】Utilities - Water Supply and Drainage - 20190618

2019-06-18View Original

Thread Content

This post was last edited by hesonchang214 on 2019-7-10 17:08. In a certain water supply system, water is drawn from a river; the river water is then conveyed to the water treatment plant via intake structures and a primary pumping station. The head loss in the water conveyance pipes in the head calculation for the primary pump house shall be calculated according to (). A. Maximum daily peak water consumption plus the plant’s own water use B. Average daily peak water consumption plus the plant’s own water use C. Maximum daily peak water consumption plus water loss D. Average daily peak water consumption plus water loss Answer: B
Reply #22019-06-18
C. Maximum daily peak water consumption plus water loss

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.