[Question of the Day] Utility Engineering – Civil Construction – 20190708

2019-07-08View Original

Thread Content

This post was last edited by hesonchang214 on 2019-7-10 at 16:22. The entire period from the time when the first specialized team starts working in the assembly line, until the last specialized team completes the final portion of its tasks and exits the assembly line, is referred to as (). A. Flow step distance B. Duration C. Construction period D. Flow rhythm. Answer analysis: The flow rhythm refers to the necessary duration required for a particular work crew on each construction section; the flow step distance is the minimum time interval between two adjacent work crews starting their sequential operations; duration is an undefined concept. From the context of the question, it is clear that what is being referred to is solely the construction period; therefore, it can be concluded that option C is the correct answer

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.