HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question】Utilities – Civil Engineering – 20190710

2019-07-10View Original

Thread Content

This post was last edited by hesonchang214 on 2019-7-12 at 12:27. When there is no water tank in the water supply system, the head capacity of the pump must meet ( ). A. Water pressure required for water inlet to the tank B. Water pressure required at the most unfavorable distribution point or fire hydrant C. Water pressure required for fire hydrants D. Water pressure required for water outlet from the tank Answer: B
Reply #22019-07-10
B. Water pressure required at the most unfavorable water distribution point or fire hydrant
Reply #32019-07-10
B. Water pressure required at the most unfavorable water distribution point or fire hydrant

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.