HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question】Utilities - Mechanical & Electrical - 20191014

2019-10-14View Original

Thread Content

In the installation of industrial furnace foundations, since the furnace track section is a concealed part of the structure, it is necessary to ensure that the key technical parameters are met during supervision. The allowable tolerances for various parts of the track installation are specified as follows ( ).    A. Deviation of the track centerline, sand seal, and the centerline of the idler wheel or sprocket of the traction mechanism: 2mm B. Height difference between various tracks on the same cross-section: 1mm C. Deviation in the gap at track joints: 1mm D. Deviation in the lateral horizontal inclination of the track: 1/1000 Answer: B
Reply #22019-10-14
A. Deviation of the track centerline, sand seal, and the centerline of the idler wheel or sprocket of the towing mechanism: 2mm

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.