HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question】Hydropower Engineering - 20200107

2020-01-07View Original

Thread Content

In accordance with the \"Opinions on Fully Implementing the River Chief System,\" it is necessary to ( ), strictly adhere to the three red lines regarding control over water resource development and utilization, control of water use efficiency, and restrictions on pollution discharge in specific water areas; enhance the responsibilities at all local levels, and enforce strict assessment and supervision. Implement measures to control both the total volume and intensity of water consumption, prevent unreasonable new water withdrawals, and ensure that water use is determined by actual needs, guided by available water resources, and adapted to local water conditions. A. Give priority to water conservation. B. Implement the strictest water resources management system. C. Restrict the development of water-intensive projects. D. Resolutely curb water waste. Answer: B
Reply #22020-01-07
B. Implement the strictest water resources management system
Reply #32020-01-07
B. Implement the strictest water resources management system

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.