HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Correct method for installing membrane elements in electronic-grade high-purity water equipment

2020-02-19View Original

Thread Content

This post was last edited by hesonchang214 on 2020-2-19 at 12:12. 1. Check whether the screws of the membrane elements in the industrial pure water equipment are tightened properly; conduct a water flow test to check for leaks. When testing with water flow, make sure to increase the water pressure gradually.   2. Adjust to the specified water production volume and recovery rate; if there are no pressure losses or other issues, maintain this operating condition for about 1 hour.   3. Sample and analyze the water quality passing through each membrane component. If there are membrane modules with abnormal water quality, it is necessary to check the sealing rings again and replace any defective components.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.