【Daily Question】Utilities – Civil Engineering – 20200302

2020-03-02View Original

Thread Content

This post was last edited by hesonchang214 on 2020-3-4 at 12:17. Which of the following statements regarding the sequence of grouting operations in the post-pile grouting technique is correct? ( )      A. For composite grouting of unsaturated soil, it is advisable to start with the side of the pile before moving on to the pile bottom. B. For saturated soil, the order for composite grouting should also be to start with the side of the pile first. C. When carrying out grouting on the side of piles in multiple sections, it is better to start from the lower part and work upward. D. For grouting of a group of piles, it is appropriate to start with the interior areas before dealing with the outer areas. Answer: C
Reply #22020-03-02
C. For multi-section pile side grouting, it is advisable to proceed from bottom to top

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.