HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What problems can occur if the model of the EDI ultra-pure water treatment equipment is incorrect?

2020-03-29View Original

Thread Content

This post was last edited by hesonchang214 on 2020-3-30 09:54. Generally, users obtain product catalogs from manufacturers and conduct comparative analyses to determine the model that meets their needs; however, some users may make mistakes in their selection due to unclear concepts regarding water quality and other related factors.   1. Water quality of the effluent: The water quality of the effluent produced by this model does not meet the required standards.   2. Water production volume: The user’s demand is not very high, which results in excessive water production and the growth of bacteria.   3. Contrary to the second point, the water production volume does not meet the user’s requirements.   4. The water demand in the laboratory has increased, and the pure water production equipment can no longer meet this demand.   5. The operation of the pure water equipment differs from that of other models, resulting in an unsatisfactory process.   

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.