HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question】Utilities - Civil Engineering - 20200330

2020-03-30View Original

Thread Content

The surface of the wall substrate should be free of impurities such as dust, oil stains, release agents, delamination, and weathering. The holes for bolts passing through concrete walls should be filled tightly layer by layer with dry-hard mortar, and then smoothed out in (()) ; The residual mortar and loose dust on the surface of the masonry wall should be removed thoroughly, and the scaffold openings should be filled layer by layer. A. Inside the wall B. Outside the wall C. On both sides of the wall D. Inside the wall Answer: A

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.