Thread Content
Recently, good news came from Yankuang Energy Rongxin Chemical’s 800,000-ton olefin project: the civil engineering work has been successfully completed. This breakthrough at this critical stage marks the project’s rapid progression from the basic construction phase to the stages of equipment installation and system commissioning, laying a solid foundation for achieving the overall goal of delivering products by the end of 2026. The completion of civil engineering work is a milestone, as well as a new starting point. At present, the construction of Rongxin Chemical’s 800,000-ton per year olefin plant has fully entered the critical installation phase. 12% of the equipment installation has been completed, and 90% of the detailed design is finished; an intelligent, digital factory is taking shape at an accelerated pace. Looking to the future, Rongxin Chemical will rely on its perseverance in overcoming challenges and its determination to see things through, using practical actions to achieve its goals and continue to write a new chapter of success on the path toward high-quality development. The annual 800,000-ton olefin production project of Inner Mongolia Rongxin Chemical Co., Ltd. has a total investment of 9.83 billion yuan and covers an area of 1,887 mu. It mainly involves the construction of an 800,000-ton/year methanol-to-olefins plant, a 400,000-ton/year polyethylene plant, a 400,000-ton/year polypropylene plant, a 15,000-ton/year 1-butene plant, as well as associated auxiliary facilities. The project uses methanol as raw material and employs MTO technology to produce polymeric-grade ethylene and polymeric-grade propylene monomers, which are then used in polymerization to manufacture high-density polyethylene and high-performance polypropylene products. By-products such as 1-butene, isobutane, C5+, and MTBE are also generated. Completion and operation of the project are scheduled for 2026, with an expected annual industrial output value of 6.67 billion yuan and an industrial added value of 2.08 billion yuan.
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to join the discussion. https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】The first prefabricated module for the plant’s process pipeline system in CNPC’s Blue Ocean New Materials project (2028–2025) has been successfully shipped. https://bbs.hcbbs.com/thread-5707283-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Problems Specific to Factories in the North: Stools in employee rest rooms lack backrests and are placed right next to the heating units. https://bbs.hcbbs.com/thread-5707651-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Problems Specific to Factories in the North: Stools in employee rest rooms lack backrests and are placed right next to the heating units. https://bbs.hcbbs.com/thread-5707651-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Haichuan Chemical Technical Documentation】Very useful! Guide to Determining the Correctness of On-site Equipment Installation in Chemical Plants https://bbs.hcbbs.com/thread-5707729-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2025 to 2035, Pingmei Shenma Hydrogen Chemistry Company managed to achieve the domestic production of spare parts for high-pressure coal slurry pumps used in gasification units. https://bbs.hcbbs.com/thread-5707406-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2886 to 2025: China’s first industrial production project using its own technology for adiponitrile via the butadiene process – Tianchen Qixiang New Materials’ 200,000-ton/year adiponitrile production facility has reached full capacity. https://bbs.hcbbs.com/thread-5707419-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】From 2887 to 2025: The world’s first 50,000 tons per year facility for producing anhydrous ethanol through synthetic gas biofermentation successfully generated high-quality anhydrous ethanol and biological proteins. https://bbs.hcbbs.com/thread-5707547-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2888-2025: Dongfang Electric’s floating wind power hydrogen production platform receives the world’s first approval certificate https://bbs.hcbbs.com/thread-5707552-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】For the first time in China, a full-scale venting test of a 10-megapascal high-pressure hydrogen pipeline was successfully carried out from 2893 to 2025. https://bbs.hcbbs.com/thread-5707979-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))