HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question】Utilities – Civil Engineering – 20200422

2020-04-22View Original

Thread Content

The waterproof layer in the reserved pits, holes, and trenches should be connected to the structural waterproof layer outside those holes (trenches). A. Determine based on the construction progress B. Maintain continuity C. Local reinforcement is possible D. Discuss with the client Answer: B
Reply #22020-04-22
The waterproof layer in the reserved pits, holes, and trenches should be continuous with the structural waterproof layer outside the holes (trenches) (B.).

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.