HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question】Utilities – Civil Engineering – 20200429

2020-04-29View Original

Thread Content

Penalties for construction units that do not construct in accordance with energy-saving design include ( ). A. Order to make corrections; the costs associated with these corrections shall be borne by the construction unit. B. Order to make corrections; the costs associated with these corrections shall be shared by both the construction unit and the project owner. C. A warning can be given; in severe cases, a fine of between 2% and 4% of the contract value may be imposed. D. A warning can be given; in severe cases, a fine of between 100,000 yuan and 300,000 yuan may be imposed. E. If, within one year, three projects are constructed without following design requirements that meet energy-saving standards, the company shall be ordered to suspend operations for rectification, have its qualification level reduced, or have its qualification certificate revoked. Answer: ACE

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.