HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Before the trial production of a chemical project, must the fire protection facilities be inspected and accepted?

2020-09-17View Original

Thread Content

Logically, fire protection facilities should be completed and inspected during the trial production phase in order to ensure fire safety during such activities. However, in many cases, the fire protection systems are not inspected during trial production but only at the time of project completion, which certainly poses potential risks. What is the procedure stipulated by the relevant regulations?
Reply #22020-10-20
Code for Commissioning of Chemical Industry Construction Projects, Article 19 of 7.0.6: The safety, first-aid, and fire-fighting facilities in each unit area of the project are fully equipped. . . The combustible gas detectors and fire alarm systems have been inspected and tested to ensure they are sensitive and reliable, and all meet the relevant safety regulations

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.