HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Discussion】Utilities - BIM - 20210126

2021-01-26View Original

Thread Content

In pipeline optimization design, the following option is not a principle for pipeline avoidance: (). A. Unpressurized pipes give way to pressurized pipes. B. Smaller pipes give way to larger pipes. C. Simpler construction methods give way to more complex ones. D. Cold water pipes give way to hot water pipes. Feel free to participate actively in the discussions; the system offers generous rewards for answering questions posed by VIP members! ! !
Reply #22021-01-26
D. Let the cold water pipe be ahead of the hot water pipe

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.