In the scorching heat of July, the intense sun beats down on the Loess Plateau in northern Shaanxi. At the construction sites of the Yan’an natural gas storage and peak-shaving project along with the associated LNG project, as well as the Yan’an crude oil reserve facility, which are under the responsibility of the Yanchang Petroleum Refining Project Command, intense heat prevails. The builders work hard in the scorching heat, sweating profusely, and multiple key installation milestones have been successfully completed, providing a solid foundation for the timely completion of the project. Fighting the high temperatures: breakthroughs in key equipment. As the \"heart\" of the auxiliary systems, the installation of the 4 dry and wet cooling towers at the Yan’an LNG project is crucial to the overall progress of the project. The construction team worked round the clock to advance the installation of the main structure, ensuring completion by the end of August in order to create a critical time window for subsequent debugging efforts. On the Luochuan Plateau, the **Strategic Reserve Project – the Yan’an Crude Oil Storage Facility – is also facing a critical electrical installation phase: 4 oil-immersed transformers have been delivered, and 34 10kV medium-voltage distribution cabinets arrived at the site 12 days ahead of schedule. “Under intense heat, the surface temperature of the equipment exceeds 60°C – every minute is a race against time! ”The voice of electrical worker Zhang Wei was hoarse, yet firm. Behind the early arrival of the equipment is an efficient \"trilateral cooperation\" mechanism established between the electrical and instrumentation team, the designers, and the manufacturers; frequent technical meetings and precise parameter verification helped to overcome numerous technical challenges amid the heat wave.
Reply #22025-07-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2058 to 2025, Shangyu, Zhejiang will build China’s first highly automated flexible/mass-production line capable of producing semiconductor KrF photoresist resins in quantities of 100 tons each. https://bbs.hcbbs.com/thread-5697374-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-07-24
【Frontiers in HaiChuan Chemical Technology】The Department of Electrical Engineering at Tsinghua University has jointly proposed a new technology for carbon reduction through the synergistic use of green electricity and green hydrogen in chemical processes: https://bbs.hcbbs.com/thread-5697382-1-1.html (Source: HaiChuan Chemical Forum)
Reply #42025-07-24
【Frontiers in HaiChuan Chemical Technology】The Department of Electrical Engineering at Tsinghua University has jointly proposed a new technology for carbon reduction through the synergistic use of green electricity and green hydrogen in chemical processes: https://bbs.hcbbs.com/thread-5697382-1-1.html (Source: HaiChuan Chemical Forum)
Reply #52025-07-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first safe hydrogen-based energy storage device was unveiled in Beijing from 2559 to 2025 https://bbs.hcbbs.com/thread-5697390-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-07-26
【Ten Years of Rapid Development in Chemical Engineering Equipment】2025–2055: Paving the way for green ammonia to replace traditional fossil fuels; the world’s first refueling operation using green ammonia as marine fuel was successfully completed. https://bbs.hcbbs.com/thread-5697473-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-07-26
Was it designed by BPDI? It’s been ten years since I left BPDI; I worked on the first LNG project
Reply #82025-07-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest solid hydrogen storage project, 2570-2025, was successfully put into operation as part of the Daan integrated demonstration project for producing green hydrogen from wind and solar energy for ammonia synthesis. https://bbs.hcbbs.com/thread-5697592-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-07-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2025 to 2035, significant breakthroughs have been achieved in China’s ultra-low temperature equipment; the country’s first 120-cubic-meter fixed ultra-low temperature storage tank was developed. https://bbs.hcbbs.com/thread-5697597-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.