Thread Content
Recently, Xi’an Petrochemical Company, which was established in 1967 and used to be one of the **five major production sites for high-grade road asphalt, was demolished. The image shows the complete demolition of the regeneration system and its associated framework in the catalytic cracking unit. The regeneration system is the heaviest single unit among the equipment to be removed by Xi’an Petrochemical Company; it is 39.98 meters tall, and together with its auxiliary structures it weighs 1,152 tons. It consists of a coaxial settler, a regenerator, an external heat exchanger, a three-stage cyclone separator, and a four-stage cyclone separator. The complete demolition and controlled lowering of such a heavy entire device is the first of its kind in the country.
The old must go if the new is to come – should it be demolished and rebuilt or will the project come to an end?
It’s quite rare to see such a large structure being demolished through a complete blasting approach. I thought it was just welder and crane work.
Build, dismantle, rebuild... three times the chicken fart
It’s really not. The original plot has been transformed and developed into a high-standard intelligent park featuring business offices, high-end manufacturing, technology research and development, exhibition spaces, and various supporting facilities, as well as a demonstration area for the deep integration of industry and urban areas.
My former factory, the integrated refining unit at Shandong’s local refinery, was demolished; it was much larger than this one
Industrial land converted to commercial use; underground pollutants are not taken into account. Isn’t this a sin?